Project summary
What the estimate was based on
This estimate shows how a smaller bathroom upgrade can still move in different directions depending on access, condition and the amount of hidden making-good required.
Scope breakdown
Improve seals and wet-area finishing
Repair or replace selected fittings
Complete small tiling and surface repairs
Finish the room ready for use
Technical breakdown
Waterproofing and reseal
Sealant renewal and wet-area detailing are often the first practical step in a bathroom refresh.
Tiling repairs
Loose, cracked or missing tiles are repaired to restore the room visually and practically.
Fittings and accessories
Taps, screens, panels and smaller fixtures can materially change the final cost.
Clean finish
The final finish affects the look, the durability and the perceived quality of the space.
Main price drivers
The amount of tiling repair needed
Whether fittings are replaced or repaired
Moisture damage or hidden deterioration
The chosen finish level
Hidden costs and risk flags
Subfloor or wall damage behind tiles
Plumbing adjustments
Extractor or ventilation issues
Premium sanitaryware or fittings
Next step
A survey is the right next step if hidden water damage or layout changes are suspected.